Environmental

Environmental

6.01 Climate Change

Leadtek Technology understands the impact of business operations on the environment and actively promotes energy conservation, carbon reduction, energy management and GHG management. We are committed to complying with all environmental regulations issued by central and local authorities, improving energy efficiency and reducing GHG emissions.

To enhance transparency, the Company follows the Task Force on Climate-related Financial Disclosures (TCFD) framework and related requirements to disclose its 2025 performance as follows:

6.01.1 Climate Oversight & Governance

Leadtek Technology obtained ISO 14001 Environmental Management System certification in 2004 and continuously promotes energy management, pollution prevention, resource efficiency and climate-related management through its environmental management system. From a product life-cycle perspective, the assessment covers procurement, product integration, logistics and delivery, product use and after-sales service. We aim to reduce pollution and resource waste, mitigate climate risks, and advance energy conservation, carbon reduction and the circular economy.

The Board of Directors is the highest governance body for climate-related risks and opportunities. It reviews sustainability strategies, establishes climate risk management policies and oversees progress toward carbon reduction targets. To embed climate issues in long-term strategy, the Board regularly reviews relevant management reports.

Day-to-day management is led by the General Manager, who convenes the Sustainability and Risk Management Committee. Department heads form the execution team to identify and assess climate risks, develop carbon reduction and energy management plans, and report progress to the Board annually, ensuring alignment between business decisions and climate actions.

6.01.2 Climate Risks & Opportunities: Business & Financial Impacts

  • Physical Risks (Short/Medium Term): The Company is gradually developing its analysis. Extreme weather may disrupt transportation and supply chains, affect delivery of electronic components, or interrupt power at operating sites, resulting in business disruption or revenue loss. Higher electricity prices, carbon fees, stricter export regulations and customer carbon-reduction requirements may also increase operating costs.
  • Transition Risks & Opportunities (Long Term): In line with global energy diversification trends, Leadtek will gradually develop a green supply chain, increase green procurement and assess the feasibility of installing solar panels on facilities. We will also focus on low-power AI technologies and develop GPU computing products with energy-saving solutions to reduce energy costs and strengthen brand resilience.

6.01.3 Financial Impacts of Climate Events & Transition Actions

Leadtek Technology focuses on AI, high-performance computing and computer businesses. Its main business is the distribution and marketing of NVIDIA products. Operations do not require large amounts of water. Past extreme weather events have not materially affected revenue, damaged physical assets or impaired access to external financing. Overall financial impacts have not been material.

To address potential fluctuations in electricity costs during the transition, the Company will continue strengthening energy-saving technologies to maintain long-term financial resilience.

6.01.4 Climate Risk Identification, Assessment & Management

The Company has incorporated climate change risk assessment into its existing risk management system. The Sustainability and Risk Management Committee coordinates the assessment results to ensure that climate risk management is aligned with the overall operational risk management system.

6.01.5 Scenario Analysis & Resilience

The Company is gradually analyzing the specific parameters and financial impacts of scenario analysis. In the future, it will refer to international and local scenarios from IEA, IPCC and NGFS and progressively integrate them with operational needs to strengthen organizational resilience.

6.01.5 Scenario Analysis & Resilience

  1. Energy Efficiency: Reduce resource and energy consumption and improve equipment efficiency.
  2. Low-Carbon Operations: Continue reducing emissions from office operations and business transportation and implement low-carbon operations.
  3. Circular Economy: Improve product recyclability and reuse rates and maximize the circular use of renewable resources.
  4. Pollution Prevention: Promote source reduction and recycling to reduce potential impacts on the surrounding environment.
  5. Green Procurement: Gradually build a low-carbon supply chain and increase the proportion of green procurement.
  6. Environmental Compliance: Strengthen regulatory identification and ensure 100% of waste is handled by licensed vendors.

6.01.7 Internal Carbon Pricing

Based on the current operating model and scale, the Company has not established an internal carbon pricing mechanism and will continue to evaluate it in line with business scale and regulatory developments.

6.01.8 Climate Targets & Progress

The Company has established the following climate-related management indicators:

  • Energy Efficiency Target: Short term (2026–2027): reduce office electricity use by 0.5% per year; medium term (2028–2030): increase the target to 1% per year.
  • Emission Reduction: Using 2023 as the GHG inventory base year, the Company targets a 1% annual reduction in GHG emissions.
  • Waste Management: Ensure 100% of waste is handled by licensed vendors and maintain zero violations of waste-related environmental regulations; reduce hazardous waste by 1% annually.
  • Water Management: Promote daily water conservation in offices, targeting a 1% annual reduction in water use while maintaining zero violations of water-resource regulations.

6.01.9 GHG Inventory & Actions

  • Inventory Planning Path: The parent company began its inventory in 2023 and plans to complete verification in 2028. Consolidated subsidiaries completed their inventories in 2024 and plan to complete verification in 2029. The 2025 disclosure covers the parent company and consolidated subsidiaries.
  • 2025 Inventory Information: Scopes 1 and 2 cover the Taiwan headquarters, major operating sites and key subsidiary Leadtek (Shanghai) Information Co., Ltd. The 2025 inventory data completed internal verification of organizational boundaries under ISO 14064-1:2018 on April 10, 2026; no external verification is currently planned.
    • Scope 1 (Direct Emissions): 43.1983 tCO2e (mainly fuel used by company vehicles).
    • Scope 2 (Energy Indirect Emissions): 550.0604 tCO2e (electricity use: 1,100,044 kWh).
    • Total Emissions: 593.259 tCO2e.
  • Energy-Saving Actions: Promote indoor air-conditioning settings of at least 25–26°C, replace lighting with LED energy-saving fixtures, reuse single-sided copy paper in offices, and assess the feasibility of installing solar panels on facility rooftops.

6.02 GHG Management(GRI 305)

6.02.1 GHG Emissions

In response to global climate change and decarbonization trends, Leadtek Technology recognizes GHG management as a core element of sustainable development. The Company continuously conducts GHG inventories to accurately understand emissions from operations and establish a basis for carbon reduction strategies and targets.

1. GHG Inventory & Assurance Information (GRI 305-1 / 305-2 / 305-3)

The Company conducts GHG inventories in accordance with ISO 14064-1 and Ministry of Environment guidelines. In 2025, total Scope 1 and Scope 2 emissions were 433.0173 tCO₂e/year. Scope 3 has not yet been fully inventoried and will be introduced and disclosed progressively according to the FSC sustainability roadmap. Emission shares and detailed data by scope are shown below:

Employee Count by Employment Type and Gender

Scope / Category Emission Source Emissions (tCO₂e/year) Scope Share (%)
Scope 1 (Category 1) Direct GHG Emissions Stationary Emissions 0 0.00%
Process Emissions 0.0042 0.00%
Mobile Emissions 16.4416 2.77%
Fugitive Emissions 26.7525 4.51%
Scope 1 Subtotal 43.1983 7.28%
Scope 2 (Category 2) Energy Indirect Emissions Purchased Electricity 550.0604 92.72%
Scope 3 (Other Indirect Emissions, Categories 3–6) Upstream and Downstream Value Chain Activities Inventory Not Completed x
Total Total Emissions 593.259 100%

Note: Under Article 2, Paragraph 1 of the Regulations Governing the Registration and Management of GHG Emissions, emissions are expressed in metric tons of CO₂ equivalent (tCO₂e) and rounded to three decimal places.

2. GHG Emissions Intensity (GRI 305-4)

To effectively assess the decoupling of business growth from carbon emissions, the Company calculates GHG emissions intensity.

Year Scope 1 & Scope 2 Total Emissions (tCO₂e) Individual Net Revenue (NT$ million) Emission Intensity (tCO₂e / NT$ million)
2023 498.239 4,276 0.1165
2024 713.416 4,208 0.1696
2025 593.259 4,436 0.1337

3. Inventory Calculation & Methodology

To ensure data accuracy and consistency, the calculation basis and references for the Company's GHG inventory are as follows:

  1. Activity Data Sources: Short term (2026–2027): office electricity reduction target of 0.5% per year; medium term (2028–2030): increase to 1% per year.
    • Mobile emissions (gasoline/diesel used by company vehicles): Based on fuel purchase records.
    • Stationary/process emissions (LPG, CO₂, etc.): Based on procurement records.
    • Energy indirect emissions (electricity): Based on Taiwan Power Company electricity bills.
  2. Global Warming Potential (GWP) Values: GHG emission equivalents are calculated using values from the IPCC Sixth Assessment Report (AR6).
  3. Emission Factors: The latest annual electricity emission factor published by the Energy Administration in 2025 is used. Emission factors for fuels and raw materials refer to the latest 2025 and 2026 GHG Emission Factor Management Table and related announcements issued by the Ministry of Environment.
  4. GHG Types Covered: The inventory covers the seven GHGs regulated by applicable requirements. Based on the actual inventory, the gases generated by operations are carbon dioxide (CO₂), methane (CH₄), nitrous oxide (N₂O) and hydrofluorocarbons (HFCs). Perfluorocarbons (PFCs), sulfur hexafluoride (SF₆) and nitrogen trifluoride (NF₃) are outside the Company's operational activities and therefore have zero actual emissions.

4. GHG Emission Reduction Plan

The Company implements daily operational carbon reduction measures in accordance with regulatory requirements. Using 2023 as the GHG inventory base year, it continues low-carbon operations through office energy-saving measures and the gradual introduction of hybrid/electric company vehicles. In 2025, total Scope 1 and Scope 2 emissions achieved reductions compared with the base year. The Company will continue advancing medium- and long-term carbon reduction targets to fulfill its environmental sustainability commitment.

6.02.2 GHG Inventory Schedule

Due to its business nature and operating scale, the Company is not currently subject to the Ministry of Environment's mandatory inventory requirements. Under the FSC sustainability roadmap, it is subject to the requirement to complete its inventory from 2026. In 2024, the Company completed the GHG inventory and verification schedule for the Group, including subsidiaries, and submitted it to the Board on March 15. The schedule was revised on August 11, 2025. Progress will subsequently be reported to the Board quarterly for monitoring. The schedule is as follows:

Task Target Completion
Establish dedicated/part-time unit, staffing and responsibilities July 2025
Establish GHG inventory plan December 2025
Complete GHG inventory April 2026
Establish GHG verification plan December 2027
Complete GHG verification October 2028

The GHG inventory and verification schedule for consolidated subsidiaries is as follows. Progress will subsequently be reported to the Board quarterly for monitoring.

Task Target Completion
Establish dedicated/part-time unit, staffing and responsibilities September 2026
Establish GHG inventory plan December 2026
Complete GHG inventory April 2027
Establish GHG verification plan December 2028
Complete GHG verification October 2029

6.03 Energy Management(GRI 302)

Leadtek Technology management recognizes the importance of energy management in mitigating climate change. The Company primarily distributes NVIDIA products and has no particularly energy-intensive operations, but it remains committed to environmental responsibility, improving energy efficiency and implementing energy and carbon reduction in daily operations to reduce environmental impacts.

6.03.1 Energy Policy & Efficiency Measures(GRI 302-4)

1. Energy Policy & Targets

To reduce energy use and GHG emissions, Leadtek Technology has established energy and carbon management targets for each stage, with performance continuously monitored by the responsible management unit:

  • Inventory Planning Path: The parent company began its inventory in 2023 and plans to complete verification in 2028. Consolidated subsidiaries completed their inventories in 2024 and plan to complete verification in 2029. The 2025 disclosure covers the parent company and consolidated subsidiaries.
  • 2025 Inventory Information: Scopes 1 and 2 cover the Taiwan headquarters, major operating sites and key subsidiary Leadtek (Shanghai) Information Co., Ltd. The 2025 inventory data completed internal verification of organizational boundaries under ISO 14064-1:2018 on April 10, 2026; no external verification is currently planned.

2. Energy & Carbon Reduction Actions

The Company continues energy and carbon reduction efforts to address environmental impacts from daily life and office operations. Major energy-saving initiatives in 2025 included:

  • Energy management standards and lighting optimization: The General Affairs Department centrally manages lighting and air-conditioning standards. Office and R&D laboratory lighting has been fully replaced with energy-efficient LED fixtures. Non-work areas such as stairways and corridors maintain appropriate brightness, with lights switched off when areas are unoccupied.
  • Air-conditioning and equipment efficiency: Indoor air-conditioning is maintained at 26°C or above. Air-conditioning equipment, chillers and piping are regularly maintained to ensure operating efficiency. Office equipment such as computers, copiers and printers is regularly maintained and placed in sleep mode or shut down when idle.
  • Operational procedures and awareness: Equipment is properly shut down during non-production or rest periods and maintained according to SOPs. Centralized production improves operating efficiency. The General Affairs Department also regularly promotes energy-saving practices such as reducing meeting-room electricity use and switching off power after work through email and posted notices.

The Company is committed to improving product energy efficiency by continuously introducing high-performance GPU and AI computing products to help customers reduce energy consumption per unit of computing and improve overall energy efficiency. For product life-cycle management, the Company is actively evaluating a quantitative energy-efficiency measurement and management system to support a green supply chain.

3. Renewable Energy & Energy Risk Management

The Company is assessing the feasibility of adopting renewable energy and gradually improving energy efficiency. It currently does not use renewable energy and will continue evaluating green electricity procurement and renewable energy adoption. Given that international energy price fluctuations and power supply stability may affect operating costs, the Company will continue strengthening energy-saving measures to reduce potential risks arising from external energy price changes.

6.03.2 Energy Use(GRI 302-1 / 302-3)

Leadtek Technology's main operations are office-based and it has no large, energy-intensive production facilities. Purchased electricity therefore represents the largest share of energy use; fuel is used only for company vehicles. Total energy consumption in 2025 was 3,200.419 GJ.

1. 2025 Internal Energy Consumption (GRI 302-1)

Energy Type Energy Source Original Unit 2025 Total Consumption Energy Consumption (GJ)
Direct Energy (Non-renewable) Gasoline kL 7.1717(kL) 234.228(GJ)
Diesel kL 0 0
LPG (Bottled Gas) kL 0 0
Indirect Energy (Non-renewable) Purchased Electricity MWh 1,100.044 (MWh) 3,960.159(GJ)
Total Total Energy Consumption 4,194.387

Note 1: The energy consumption data cover activities within the Company's operational control boundary for 2025 and are consistent with the GHG inventory boundary (Scopes 1 and 2).

Note 2: Energy conversion factors are based on the latest Energy Product Unit Calorific Value Table published by the Energy Administration and converted to GJ. Electricity: 1,000 kWh = 3.6 GJ; gasoline: 1 kL = 32.66 GJ; diesel: 1 kL = 36.13 GJ; LPG: 1 kL = 24.94 GJ.

2. 2025 Internal Energy Intensity (GRI 302-3)

To assess the relationship between operating efficiency and energy consumption, the Company calculates internal energy intensity using annual individual net revenue as the denominator:

Item Unit 2023 2024 2025
Total Energy Consumption GJ 3383.858 4792.554 4,194.387
Individual Net Revenue NT$ million 4,276 4,208 4,436
Energy Intensity GJ / NT$ million 0.791 1.139 0.946

Note 1: Internal energy intensity is calculated by dividing total energy consumed in the year (GJ) by individual net revenue for the year (NT$ million).

Note 2: This intensity ratio covers only internal energy consumption, including direct gasoline and diesel use and indirect purchased electricity use.

6.04 Water Management(GRI 303)

Water is a valuable natural asset. Leadtek Technology's main operations are product distribution and limited system assembly, with no high-water-use processes such as wafer manufacturing. Water demand is therefore low and mainly consists of employee domestic use and limited laboratory cleaning. Although the Company does not have water-intensive operations, it actively promotes water conservation and efficient use to reduce environmental impacts.

6.04.1 Water Management

Based on the assessment, the Company's operating sites are not located in areas of high water stress. All major water supplies come from municipal water, with no groundwater, surface water or seawater extraction. There is no significant impact or water withdrawal pressure on local water resources or ecosystems.

To improve water-use efficiency, Leadtek Technology continues to implement the following water management and conservation measures:

  • Employee Awareness: Water-saving notices are posted in offices and restrooms to strengthen employee awareness.
  • Water-Saving Facilities: In coordination with building management, water-saving faucets and dual-flush toilets with water-efficiency labels have been installed, along with regular leak inspections and abnormal water-use monitoring.
  • Resource Recovery & Diversion: Through coordination with building management, the Company continues to assess and promote rainwater reuse, water-quality diversion and pollution prevention to maximize water-use efficiency.

6.04.2 Water Use

Leadtek Technology's operating sites are all in areas without high water stress. Water withdrawal from 2023 to 2025 is shown below. In 2025, total water use decreased from the previous year due to operational adjustments and continued water-saving measures, totaling 2,594 m³.

【2025 Water Withdrawal & Risk Analysis】

Water Source 2025 Water Withdrawal (m³) Withdrawal Share (%) Withdrawal from High Water-Stress Areas (m³)
Third-Party Water (Municipal Water) 2,594 100% 0
Surface Water 0 0% 0
Groundwater 0 0% 0
Total Water Withdrawal 2,594 100% 0

Note: Water withdrawal data are based on actual bills from Taiwan Water Corporation. 1 unit = 1 m³.

6.04.3 Wastewater Discharge & Water Consumption

The Company's discharges comply with regulatory requirements. It emphasizes lawful and environmentally responsible wastewater discharge, with no violations of water pollution control regulations recorded in 2025.

1. Wastewater Discharge Management (GRI 303-4)

Based on written review by the local authority (Beihuan Si Zi No. 0910057747), Leadtek Technology was classified as an establishment “not currently subject to regulation.” There is no highly polluted industrial wastewater at the site.

Domestic wastewater and laboratory cleaning wastewater are handled through a complete independent wastewater treatment system as follows:

  • Domestic & Laboratory Wastewater: All wastewater is handled centrally by the park/building management committee.
  • Regular Inspections: The management committee conducts regular inspections to ensure wastewater treatment from sedimentation and aeration through final discharge fully complies with government environmental standards before discharge into the public sewer system.

Leadtek Technology also cooperates with periodic government inspections, with no violations identified.

2. Water Consumption & Discharge Data (GRI 303-5)

As a non-manufacturing company, most water is used for employee washing and restroom use. Products do not involve water-intensive processes, so water evaporation and water retained in products are minimal. Total water withdrawal is therefore close to total water discharge.

Three-Year Water Discharge & Consumption (Unit: m³)

Item 2025 2024 2023
Total Water Withdrawal (Third-Party Water / Municipal Water) 2594 3221 2859
Total Water Discharge (to Third-Party Sewer) 2594 3221 2859
Total Water Consumption 0 0 0

Note 1: Under GRI 303-5, total water consumption = total water withdrawal − total water discharge. As a non-manufacturing company, water is discharged into the wastewater system, so consumption is close to 0.

Note 2: Water charges at the headquarters are handled centrally by the building management center; only water use at the Company's plant site is included in the statistics.

6.05 Waste Management(GRI 306)

Leadtek Technology is committed to resource circularity. Waste generated by operations mainly consists of general waste from office employees and a small amount of industrial waste from factory processes. The Company strictly controls outsourced waste collection and transportation to ensure compliant handling.

6.05.1 Waste Management & Mitigation

  • General Waste & Recycling: The headquarters is located in a commercial office building. General household waste and recyclables such as paper and plastic bottles are collected and handled centrally by building management.
  • Waste Reduction: Source reduction is prioritized, followed by recycling and reuse, and finally lawful disposal. The Company promotes reuse of single-sided paper, paperless electronic processes and reduction of single-use packaging.
  • E-Waste Management & Recycling: Replaced IT equipment and waste electronic components from R&D, such as E-0217 and E-0221, are collected by legally registered qualified vendors. Retired electronic equipment is also properly dismantled and recycled by qualified recyclers to maximize resource recovery.

6.05.2 Waste Generation & Targets

Leadtek Technology reported 0.024 metric tons of hazardous industrial waste in 2024 and 0.024 metric tons in 2025, with no increase. The Company ensures 100% of waste is handled by licensed vendors and maintains a zero-violation environmental compliance record.

Three-Year Waste Generation (Unit: metric tons)

Waste Type Treatment Method 2025 2024 2023
General Waste Collected by Building Management Not separately available; managed by the building.
Hazardous Waste Incineration/Landfill by Qualified Vendors 0.024 metric tons 0.024 metric tons 0.024 metric tons

Leadtek Technology strictly complies with environmental regulations. In 2025, the Company recorded no violations of the Waste Disposal Act or related environmental regulations, and no chemical spills or environmental pollution incidents. All waste management measures comply with government requirements, and the Company cooperates with periodic inspections by competent authorities.

6.06 Biodiversity(GRI 101)

Leadtek Technology recognizes the importance of biodiversity to global ecological balance and sustainable business. The Company incorporates natural capital protection into its environmental management system and continues to monitor GRI 101: 2024, biodiversity regulations and TNFD framework developments. It is gradually establishing risk management mechanisms to ensure harmonious coexistence between business operations and local ecosystems.

6.06.1 Biodiversity Governance & Policy

1. Management Policy & Commitment

The Company obtained ISO 14001 Environmental Management System certification in 2004 and follows the Environmental Protection Act and international biodiversity principles. It commits not to develop in legally protected ecological areas, important habitats or biodiversity-sensitive areas.

Biodiversity and natural capital management are incorporated into environmental projects by the Sustainability and Risk Management Committee, with the Board regularly reviewing material risks and management performance. This strategy is also integrated with climate change, energy and waste management.

2. Management Approach

  • Green Products & Environmental Management: The Company is gradually strengthening hazardous substance management and promoting green product management in line with product specifications to reduce potential environmental loads on soil, water bodies and surrounding ecosystems during product manufacturing and use.
  • Supply Chain Environmental Management: Suppliers are encouraged to comply with environmental regulations and green product requirements and continuously improve environmental management capabilities. Joint implementation of environmental measures across the supply chain helps reduce potential impacts on nature and ecosystems.
  • Waste Management & Pollution Prevention: The Company manages waste classification, reporting and collection in accordance with applicable regulations and continues to promote resource circularity and waste reduction to reduce potential impacts from improper waste disposal on the surrounding environment and habitats.

6.06.2 Biodiversity Impact Assessment

The Company conducts biodiversity risk and impact assessments for operating sites and their value chains. The 2025 assessment results are as follows:

1. The Company uses the LEAP framework to assess nature-related issues. The 2025 results are as follows:

Locate (Location) As of the end of 2025, Leadtek Technology's headquarters and core R&D sites were located in developed urban areas and industrial parks, not in or near legally designated ecological sensitive areas such as national parks, nature reserves or World Heritage sites.
Evaluate (Dependencies) The Company's operations mainly depend on stable electricity supply and public water supply.
Assess (Risks) Biodiversity loss may create risks related to raw material availability, regulatory compliance and brand reputation.
Prepare (Management) The Company continues to promote green design and recycling of waste electronic equipment to reduce dependence on natural capital.

【2025 Natural Capital Performance Indicators】

Assessment Item 2025 Performance Indicator
Development in Protected Areas 0 cases
Environmental Violations 0 cases
Hazardous Substance Compliance Rate 100%
E-Waste Recycling Rate 100%
Major Ecological/Spill Events 0 cases

2. Impact Assessment:

  • Habitat Change: In 2025, operations and new projects were conducted within existing buildings, with no forest clearing, green-space conversion, wetland acquisition or land-use conversion. There was no direct destructive impact on local species habitats.
  • Invasive Species Introduction: The Company's processes are closed and its operations do not involve biological vectors. No invasive non-native species have been introduced or released, and the assessed impact risk is low.
  • Threatened Species: Based on the Ministry of Environment's Taiwan Red List and the IUCN Red List, no significant direct impacts on threatened species in the assessment areas were identified from the Company's operating activities. Indirect impact risk is low and will continue to be monitored.